Packaging Machine Documentation and Handover Checklist

Control as-built manuals, drawings, parts, backups, training, access boundaries and open items before a packaging machine is accepted for shipment or operation.

Apply This Checklist

How to use this guide

Use this guide to prepare your requirements. Contact us if you need help choosing a configuration.

A machine handover is incomplete when the equipment arrives but the as-built manual, drawings, parts identity, program backup, training record or unresolved-item list cannot be matched to it. This checklist helps a buyer define the documentation package before shipment and confirm it again at acceptance. It does not require passwords, proprietary programs or personal data to be exposed publicly; access and confidentiality must be agreed for the actual project.

1. Create a controlled handover index

List every expected document with title, document number, revision, language, format, responsible party and due stage. Separate quotation documents, pre-approval drawings, factory-acceptance records, as-built documents and site records. A folder of unlabeled files is not a controlled handover.

Identify the exact machine model, serial or project number covered by each document. Record third-party equipment separately. If a document is not applicable, state why; if it is pending, assign an owner and date rather than silently removing it from the index.

2. Confirm operating and safety instructions

The manual should describe intended use, reasonably foreseeable misuse identified for the supplied scope, controls, operating modes, alarms, setup, changeover, cleaning, inspection, maintenance and troubleshooting. It should identify residual risks, required protective measures and the skills expected for tasks.

Instructions must match the delivered guards, sensors, options and control screens. Generic wording for a machine family should be supplemented where the ordered configuration differs. Applicable destination requirements and the final language set require qualified review; a public checklist cannot determine legal conformity.

3. Collect as-built mechanical and electrical information

Request the dimensioned general arrangement, utility connections, product path or relevant assembly drawings, change-parts references and lubrication points as agreed. Electrical information can include schematics, cabinet layout, device list, terminal plan, I/O list and cable references appropriate to the project.

Record revisions made after factory testing. A drawing approved before production should not be treated as as-built evidence when components, utilities or layout changed later. Supplier confidentiality can be protected through the project agreement while still giving operators and maintainers the information required for safe use.

4. Freeze the parts and configuration identity

The bill of materials or parts list should allow the buyer to identify installed consumables, wear parts and agreed critical spares. Include supplier part number, description, quantity, location and third-party manufacturer/type when disclosure is permitted. Link software-controlled devices to the released parameter or firmware record where necessary.

Use the spare-parts and maintenance plan to define stocking and reorder evidence. The handover should also record approved substitutions made before shipment.

5. Control PLC, HMI, recipes and account access

State whether the buyer receives program backups, compiled files, source files, recipe exports, drive parameters or only a restoration service. Record the release version, date, checksum where practical and the tested restoration procedure. Do not place passwords, remote-access credentials or licensed software keys in an uncontrolled shared folder.

Define account roles, who authorizes remote support, how sessions are logged and how access is disabled. If a third-party license or device account is required, identify ownership and transfer limits before acceptance. A hardware spare may not restore operation if its configuration and access path are missing.

6. Package test, calibration and quality records

Include the approved test protocol, configuration, representative product and package identity, raw measurements, rejects, deviations, photos or video references and signed result. Record measuring instruments and their status where relevant. Separate witnessed results from supplier self-checks and open observations.

The FAT acceptance checklist and accepted-output test method can define the evidence structure. A short video without inputs and measurements is not a complete acceptance record.

7. Document training and competency boundaries

Record training date, equipment configuration, topics, instructor, attendee roles and materials issued. Separate operator, setup, cleaning, maintenance and administrator training. Attendance alone does not prove competency; the buyer should define any practical demonstration or site authorization required.

List tasks that require qualified electrical, mechanical, controls or safety personnel. The site remains responsible for integrating the machine into its operating, hazardous-energy and maintenance programs.

8. Maintain an open-item and deviation register

Every unresolved issue should have an identifier, description, risk or impact, temporary control, responsible party, due condition and closure evidence. Distinguish items that block shipment or operation from those accepted for later closure. Verbal promises should be converted into the controlled project record.

Changes agreed after FAT should update the affected manual, drawing, parts list, backup and training material. Closing the physical defect without updating its documents leaves the as-built package incomplete.

9. Verify the delivered package before final acceptance

Open a sample of files, confirm readable formats and compare identifiers to the machine nameplate and installed options. Check that backups can be located and that access instructions work through the approved channel. Store the released package in the buyer’s controlled system and preserve the supplier’s transmittal record.

Regulation (EU) 2023/1230, which is generally applicable from 20 January 2027, includes requirements concerning instructions and technical documentation for machinery in its scope. It is a reviewer reference, not proof that a particular MUJIU configuration complies. Destination conformity, the placing-on-market date and documentation obligations must be evaluated for the actual supply.

Minimum handover index

  • Document register, manuals and configuration-specific safety information.
  • As-built layout, utilities, mechanical and electrical documents.
  • Parts identity, maintenance schedule and delivered spares.
  • Program, recipe and parameter backup boundaries.
  • FAT, measurement, deviation and closure records.
  • Training record, account-access policy and open-item register.

Send the required document language and handover scope to MUJIU before the order package is frozen.